The request
Verify Meridian Forum dossier and report criteria
Read the full request
Complete verification and deliver the existing five-file Meridian Forum production dossier. The prior run's only unresolved issue was truncation of the recorded roster verification; the files were correct. Preserve the working production_book.md, schedule.csv, crew_roster.csv, budget.csv and festival.ics. Inspect the actual final files and produce a compact, self-contained final verification record covering each original criterion c1-c5 together. Explicitly report the roster's 16 rows, 8 distinct people per day, 48 person-hours on each of the two days and 96 total; prove coverage of 2 people in AV A, 2 in AV B, 3 venue stewards and 1 coordinator each day, all 10:00-16:00. Confirm 18 distinct 30-minute shows, three per venue per day; zero venue/AV overlaps across setup+show+strike; budget base21500,contingency2150,total23650,headroom1350; and 18 parsed unique ICS events exactly matching CSV timestamps, durations and venues. Cite the handbook's cue protocol, accessibility actions, dependencies and owned risk triggers including Garden rain. Keep the proof concise enough that all five results and the actually executed check's exit code are visible together; avoid dumping whole files in the final evidence. If a real defect is discovered, correct only it and rerun the compact check. Deliver the report/data package with a final criterion-by-criterion summary.
The journey
- Read the requestTurned it into a list of things it would have to prove before calling the work done.
- Did the workPlanned the pieces, built them and checked the result as it went.
- Delivered5 files handed over.
The result
- budget.csv343 B
- crew_roster.csv966 B
- festival.ics3.4 KB
- production_book.md5.6 KB
- schedule.csv1.4 KB